Skip to the tool
Kitchen Remodel Cost Calculator

Whole project

Work out a kitchen remodel cost from the room, not from a budget

Type in the room. This page works out how many linear feet of cabinet the walls will hold, how many boxes that becomes, how many square feet of counter sits on top of it, how many hours each trade spends in the room, and what all of that costs at the prices you have actually been quoted where you live. It never asks you for a budget and multiplies it by something.

Your kitchen, and what it derives

The room
ft
ft
in

This tool treats a ceiling of 102 inches or more as tall enough to stack wall cabinets (a threshold of ours), which adds cabinet cost and no counter.

in
Cabinet runs
in

The longest wall of cabinets, corner to corner.

in
in
in
Island
in
in
in
Scope
USD

Ask your building department for this figure. The field opens on an example amount, and this site prints no national permit fee.

Your local unit prices

The numbers already in these fields are an illustrative example kitchen chosen by this site — Illustrative assumption — not a market quote. We have no defensible national figure for what a linear foot of cabinet costs, so replace each one with the price you have been quoted locally. The subtotal is only as good as these entries.

USD
USD
USD
USD
USD
USD
USD
USD
Labour assumptions you can overwrite
x

Our own multiplier converting a BLS wage into an hour a contractor bills. It stands in for payroll tax, workers compensation, liability insurance, truck and tool cost, supervision, office overhead and profit. We did not find a published national residential-remodelling burden factor, so this is an assumption and not a measurement. If your contractor has told you their multiplier, type it in and this figure is replaced.

Protection, dumpster, daily clean and supervision.

Derived project subtotal, before contingency

$38,389

Scope tier derived from your answers: Reconfiguration.

Range across the 25th–75th percentile wage (other inputs held at the values above) $36,733 to $40,765

The unit prices, appliance budget, permit fee and hardware allowance pre-filled above are an example kitchen — Illustrative assumption — not a market quote. Replace them with the prices on your own quotes.

Cabinet linear feet 32.5 derived from your runs
Cabinet boxes 10 at standard widths
Counter square feet 52.7 33.5 ft of exposed edge
Trade hours 121.6 across 5 trades
Cost per cabinet foot $1,181 whole project, not just boxes
Labour share 22% of the derived subtotal

Biggest swing factor Across the whole project the widest single band is cabinetry, worth roughly $8,190 if the cabinet price moved by 60%. The 60%, 80% and 70% swing sizes for cabinets, counters and appliances are our own assumptions, used only to compare the lines; the labour band is the published wage spread.

The tier is a consequence, not a choice

Services move even though the room does not come apart. The plumbing and electrical scope is what separates this from a straight replacement, and it is easy to leave out of a first quote.

A menu of budget tiers asks which tier you want, which puts the logic backwards. A reconfiguration is what a decision such as putting the sink under the window costs. The four tiers below are named by what has to happen, so you can see which decision moves you between them.

TierWhat defines itWhat sets the priceWhat can still surprise you
Surface refreshBoxes stay, doors and surfaces changeMaterial selections and the door countWhat the old doors and surfaces were hiding.
Same-footprint replacementNew boxes and counters in the same positionsCabinet grade and counter materialWhatever is behind the old cabinets — the wall may not be as flat as the old boxes implied.
ReconfigurationServices move, walls stayHow far the drain travels and how many circuits are newThe drain route, which the sink tool on this site checks against your floor.
Gut and relocateWalls open or come outTrade sequencing and inspection holds, not finishesStructure, old wiring, old plumbing and the permit history of work you did not do.

Where the material money goes

Each line below is a quantity this page derived from your room, multiplied by a unit price in the form above — an illustrative example until you replace it. Nothing in this table is a national average.

LineDerived quantityYour unit priceLine totalHow the quantity was derived
Cabinetry32.5 linear ft (10 boxes)$420.00$13,65015.5 base + 13.5 wall + 3.5 tall linear feet, derived from your wall runs after appliance openings and blind corners were taken out.
Cabinet hardware10 boxes$26.00$260One pull or knob allowance per box, derived from the box schedule rather than guessed.
Countertops52.7 sq ft, 33.5 ft of exposed edge$78.00$4,111Counter run length times your counter depth, plus the island. Ranges and refrigerators break the run, dishwashers and cooktops do not — which is why this is not the same as cabinet linear feet.
Appliance packageas specified$7400.00$7,400Your own figure. We publish no appliance price table because we have no source for one.
Sink, faucet and disposal1 set$950.00$950Your own figure.
Lighting fixturesas specified$780.00$780Your own figure.
Backsplash material28.5 sq ft$22.00$627The full length of each wall run that carries wall cabinets (including the bays over the range and refrigerator) times the height from counter to cabinet underside.
Flooring material180 sq ft$9.00$1,620Room length times room width. Flooring under the cabinets is included because this tool assumes the floor is laid first.

Materials come to $29,398 and permits to $640. Labour is derived separately: our assumed hours for each task, priced at published BLS wages, times the multiplier and general-conditions figures above. It is explained on the trade labour page.

Where the labour money goes

This scope generates 121.6 trade hours from our own assumed hours-per-unit rates, listed on the methodology page. Each trade's hours are priced at that trade's national BLS wage percentiles and multiplied by 2.20 to reach a billed rate. The low figure uses each trade's 25th-percentile wage and the high figure its 75th. The wages are published by BLS; the hours and the multiplier between wage and billed rate are ours.

TradeHoursAt 25th percentileAt medianAt 75th percentile
Carpenters (SOC 47-2031)48.8$2,504$3,126$3,966
Tile and Stone Setters (SOC 47-2044)34.1$1,631$2,009$2,534
Electricians (SOC 47-2111)22.7$1,187$1,517$2,016
Plumbers, Pipefitters, and Steamfitters (SOC 47-2152)11.5$610$776$1,035
Painters, Construction and Maintenance (SOC 47-2141)4.5$210$233$291

Carpenters (SOC 47-2031) carry 48.8 of the 121.6 hours in this scope, and the published gap between a 25th- and a 75th-percentile worker in that trade is worth $1,462 on this job alone. The wage gap is measured by BLS; the hours and the wage-to-billed multiplier are this tool’s.

What this number does not include

Not in the subtotal above

  • Anything behind a wall that nobody has looked behind yet
  • Structural repair discovered during demolition
  • Asbestos or lead testing, abatement and clearance
  • Bringing unpermitted earlier work into compliance
  • Appliance delivery, installation and haul-away of the old units, unless your appliance quote says otherwise
  • Window, door and exterior repairs triggered by a new vent termination
  • Temporary kitchen setup and the cost of eating out
  • Sales tax, financing cost and any contractor deposit that is non-refundable

The unknowns on that list do not all apply to your house. The contingency tool works out which of them your answers about the building open, and weights a reserve for each one, instead of applying one flat percentage.

Four questions that move this number

  1. Does the sink move? Work out whether the drain can physically get there before you accept a price for it. Moving the sink can change the tier on its own.
  2. How many linear feet do you actually have? The takeoff tool breaks the runs into real boxes, which is how cabinets are quoted and how you check a quote.
  3. How many slabs? Counter cost is a yield problem: the slab count multiplies whatever price per slab you are quoted.
  4. When are the cabinets ordered? The schedule tool works backwards from the lead time to the latest order date that keeps the site moving.